Software requirements document template (free SRS you can copy)
A software requirements document, often called an SRS or software specification, describes what a piece of software must do and how well it must do it, so a developer can build it and you can check the result. The free software requirements document template below has eight sections, each with what to write and example lines you can copy. If you want a team to turn your finished document into working software, Zoti builds custom projects starting at $499/month.
Updated November 3, 2026
- Sections
- 8, from purpose to acceptance criteria
- Best for
- Founders and teams briefing a developer or agency
- Cost to use
- Free, copy it into any doc
How to fill in this software requirements document template
- Copy the section headingsPaste the eight numbered headings below into a shared doc. Keep the numbering so people can point to “section 4, FR-012” in conversations.
- Write purpose and scope firstAgree on why the software exists and what is out of bounds before anyone writes a single requirement.
- List users, then their requirementsWrite functional requirements from each user’s point of view. Every requirement should belong to a role from section 3.
- Add numbers to the quality sectionNon-functional requirements only help if they can be measured, so write “loads in under 2 seconds”, not “fast”.
- Review it with the people who will use itWalk through the document with real users and the developer. Questions they ask are gaps you need to fill.
- Version it and keep it currentPut a version number and date at the top. When something changes, update the document rather than deciding it in chat.
1. Purpose
One or two short paragraphs on why this software is being built. Anyone who reads only this section should understand the problem and the outcome you want.
- The problem in plain words, and who has it today.
- What will be different once the software exists.
- The document version, date and owner.
- Example: “This document describes a booking and invoicing app for Harbor Pool Service. Today, jobs are scheduled by phone and tracked in a spreadsheet, and invoices go out late. The app will let customers book online and send invoices automatically when a job is marked done.”
2. Scope
Scope draws the boundary. The “out of scope” list matters as much as the “in scope” list, because it prevents arguments later.
- In scope: the main features or modules in this version.
- Out of scope: things people might assume are included but are not.
- Phases: what is planned for a later version.
- Platforms: web, iPhone, Android, desktop, or a mix.
- Example: “In scope: online booking, technician schedule, invoices and card payments. Out of scope: payroll, inventory. Later phase: customer mobile app.”
3. Users and roles
List every type of person who will log in or be affected, and what each one is allowed to do. This section drives permissions, screens and testing.
- Role name and a one-line description.
- What each role can see, create, edit and delete.
- Roughly how many people hold each role, now and in a year.
- Example: “Office manager: sees all jobs, edits schedules, issues refunds. Technician: sees only their own jobs for the day, marks jobs done, adds photos. Customer: books, pays and sees their own history.”
4. Functional requirements
This is the core of the software specification template: what the system must do. Give each requirement an ID, a priority and a test. Use this format for every one:
- ID: FR-012
- Role: Technician
- Requirement: The technician can mark a job as done from a phone, add up to 10 photos and a note.
- Rules: A job cannot be marked done without at least one photo. The time is recorded automatically.
- Priority: Must have (other options: Should have, Nice to have).
- How we will check it: Mark a test job done with no photo and confirm it is blocked; add one photo and confirm it saves and triggers the invoice in FR-020.
- Tip: group requirements by area (Booking, Scheduling, Invoicing) and write one behavior per requirement. If a sentence has “and also”, split it.
5. Non-functional requirements
How well the software must work. Developers use this section to choose hosting, architecture and security measures, so be specific.
- Performance: “Pages load in under 2 seconds on a normal 4G connection.”
- Availability: “Booking must be available around the clock; planned maintenance happens overnight with notice.”
- Security: “Staff logins use two-factor authentication. Card details are handled by the payment provider and never stored by us.”
- Compliance: any rules that apply, such as HIPAA for health data or PCI for card payments.
- Usability and accessibility: “Technician screens work one-handed on a phone. Customer pages meet WCAG 2.1 AA.”
- Scale: expected users, records and growth.
- Backups: “Data is backed up daily and can be restored within one business day.”
6. Integrations
Every other system the software talks to. Integrations are where projects most often grow in cost, so name them early.
- System name and what it is used for.
- Direction: does data flow in, out, or both?
- Trigger and frequency: real time, every hour, nightly.
- Who owns the account and API keys.
- Example: “QuickBooks Online: paid invoices sync out within 5 minutes. Google Calendar: technician jobs sync one way to their personal calendars.”
7. Data
What information the system stores, where it comes from and how long it is kept.
- Main records and their key fields (customer, job, invoice, technician).
- Existing data to import, its source and rough size.
- Retention and deletion rules.
- Reports and exports people need.
- Example: “Import about 2,400 customers and 3 years of job history from the current spreadsheet. Keep invoices for 7 years. Office manager can export any list to CSV.”
8. Acceptance criteria
How you will decide the software is finished and ready to launch. Agree on this before the build starts.
- All “Must have” requirements pass their checks from section 4.
- Non-functional targets from section 5 are met in testing.
- Who signs off, and how long they have to test each round.
- What counts as a launch-blocking bug versus one that can be fixed after launch.
- Example: “Launch when the office manager and two technicians have run one full week of real jobs in the app with no blocking bugs.”
Common mistakes in software requirements documents
- Describing screens instead of needs. Write what the user must accomplish and let the designer propose the screen.
- Vague words with no number: fast, easy, secure, scalable.
- No “out of scope” list, so every assumption becomes a dispute.
- Requirements with no owner or role attached.
- Hiding business rules in people’s heads. If the office “always” does something, write it down.
- Treating the document as finished. It should change as you learn, with each change dated.
- Writing 80 pages before talking to a developer. A short, clear SRS reviewed early beats a long one written alone.
More templates & ideas software: micro SaaS ideas, software development RFP template, business requirements template and software development contract checklist.
Common questions
What should a software requirements document include?
At minimum: the purpose, the scope (including what is out of scope), the users and their roles, functional requirements, non-functional requirements such as speed and security, integrations, data, and acceptance criteria that say when the work is done.
What is the difference between an SRS and a BRD?
A business requirements document explains why the project exists and what the business needs to achieve. An SRS turns that into specific, testable statements of what the software must do. Most projects write the BRD first, then the SRS.
How long should a software requirements document be?
As long as it needs to be to remove guesswork, and no longer. A small internal tool might fit in 5 to 10 pages. A larger product can run much longer, but it should still be organized so each requirement is easy to find.
Who writes the software requirements specification?
Usually a product owner, business analyst or project manager writes it, with input from the people who will use the software and the developers who will build it. Founders often write the first draft themselves using a template like this one.
Do agile teams still need an SRS?
They need the same information, even if it lives in user stories and a backlog instead of one document. A short SRS is still useful for agreeing on scope, quality targets and acceptance criteria before work starts.